Back to photostream

Particle Beam Alignment Transit

This may be the only physical evidence left that I worked in the University of Notre Dame Nuclear Structure Laboratory. I had this crazy rig built sometime around 1979 I would guess. Its purpose was to check the alignment of the beam line through the Ortec scattering chamber.

 

I am not too sure anyone (other than me) has ever used this after it was installed and aligned but it was a hoot to see it still standing 30 years later.

 

0920D_6963-2477

128 views
0 faves
0 comments
Uploaded on August 21, 2009
Taken on August 17, 2009