Croes Newydd West Fork

A lovely shot of 8750 class 0-6-0PT No 9610 coming off shed at Croes Newydd, in 1966

 

Croes Newydd West Signalbox controlled access to and from the shed on the Wrexham and Minera line. The Wrexham and Minera Railway was one of several constructed to serve the intensive quarrying, mining and iron founding operations in the area west of Wrexham, which was undergoing considerable expansion in the mid 19th century thanks to the exploitation of the underlying Middle Coal Measures.

The section of line between Brymbo and Minera had originally been part of the former North Wales Mineral Railway, built in 1844 and later incorporated into the Great Western Railway. This line's operation was constrained by the rope-worked inclines, locally known as "brakes", and tunnels along its route through the hilly country between Wheatsheaf Junction, near Wrexham, and Brymbo. As a result, an Act of 1861 proposed that a new railway, the Wrexham and Minera Railway, would be constructed from Croes Newydd, at Wrexham on the main Shrewsbury-Chester line of the Great Western Railway to Brymbo, where it would join the GWR's existing route to Minera. The new railway company would have a capital of £48,000 in total (£36,000 of which would be in shares) and the power to enter into an agreement with GWR on operational matters and division of receipts. George Robert Jebb, who had previously worked on the Shrewsbury-Chester route, was appointed Resident Engineer. The line was fully completed and jointly leased to the GWR and LNWR, within whose "sphere of influence" it also fell, in June 1866. A short branch was also constructed through to the colliery at Vron, owned by William Low, one of the Wrexham and Minera company's directors. In the 1870s a further extension, the Wrexham and Minera Joint Railway, was built from Brymbo through to an end-on connection with the LNWR's Ffrith Branch, which ran from Llanfynydd to Coed Talon near Mold. This line was jointly operated by the GWR and the LNWR - the only line in North Wales to be so operated. The completion of this link through the Cegidog valley not only gave the GWR a route to Mold but allowed the LNWR access to the North Wales Coalfield. The construction of the Wrexham-Brymbo line led to the immediate abandonment of the North Wales Mineral Railway's original Brymbo (or "Brake") tunnel and incline. The lower section of the NWMR route from Wheatsheaf Junction, through Summerhill Tunnel, to Moss remained in use until 1908 for colliery traffic.

Between 1882 and 1905 the GWR gradually introduced passenger services between Wrexham and Minera, in response to requests from local communities. Halts or stations were located at Plas Power (Southsea), the Lodge, Brymbo, Brymbo West, Pentresaeson (for Bwlchgwyn), Coedpoeth, and Vicarage Crossing (Minera), with a passenger terminus at the rather remote Berwig Halt. From 1905 the GWR began operating a railmotor service, with as many as fifteen workings on Saturdays. ] The LNWR ran its own passenger trains from Mold south to the joint station at Brymbo. In 1905, the businesses of Coedpoeth campaigned for the Great Western Railway Company to lay a new branch from the existing Coedpoeth Station into the village centre. The local business's claimed the station was too far away (being effectively located in Minera) to serve them properly and was of little convenience. Regardless, their petition failed miserably. This may have been because the gradient was simply too steep for conventional rail, as well as the little profit for a large undertaking. Despite this situation, Coedpoeth station remained a main focal point for the area, serving several villages with a combined population of around 9000 people.

At the top end of the line, there was a mile-long spur, the New Brighton branch, along the flank of Esclusham Mountain serving the Delafield Minera Lead Mines (which operated their own locomotive Henrietta, a Manning Wardle 0-6-0). The mines closed in 1910 and the spur was pulled up, only to be opened again for several years from 1920 to serve silica clay beds. The line ran west from Croes Newydd, steadily climbing through the farmland west of Wrexham. Shortly beyond Croes Newydd yard, the GWR's Moss Valley branch (serving several collieries near Moss, with a spur running as far as Ffrwd north of Brymbo) diverged. The main Brymbo branch continued westwards passing the industrial villages of New Broughton and Southsea, where there were connections to more collieries. Swinging northwards and still climbing, it ran along the eastern side of a rather steep valley to Brymbo, where the joint line to Coed Talon diverged just beyond the main joint station. At Brymbo Middle signal box a short trailing branch south-west to Vron served the collieries there, passing through the steelworks en route. The section from Brymbo West onwards to Minera remained solely in GWR ownership: traversing the rural area west of Brymbo, it passed the brickworks at Cae-llo and the steel company's siding at the Smelt mine, where fireclay and coal were mined, before reaching Minera, 3 miles and 1234 yards beyond Brymbo West. This part of the route featured a large number of level crossings over minor roads. Competition from new bus services meant that the GWR's passenger service from Wrexham was cut back to Coedpoeth from 1926, and discontinued entirely at the end of 1930, but the small goods office and water tower were left standing at Coedpoeth, as steam locomotives needed replenishing after the hard climb from Croes Newydd. All lines continued in use for freight traffic, however, and the passenger service from Mold to Brymbo (now operated by the LNWR's successor, the LMS) continued with five trains a day on weekdays throughout the 1930s, despite there now being no onward connection to Wrexham. The end section of the Vron branch was closed in 1930 along with the collieries it served, but part of its length from Vron Junction remained in use to serve the increasing steelworks traffic. Passenger traffic on the joint line from Brymbo to Coed Talon declined during the Second World War, however, with only two passenger trains a day in each direction, largely maintained for schoolchildren attending school in Mold. The passenger service was finally withdrawn in 1950 by British Railways, with the final closure of Brymbo station, although its goods siding remained open. The Brymbo-Coed Talon line was taken out of use in 1952, although it was not formally closed until 1963.

The route from Croes Newydd to Brymbo was double-tracked and built to a standard designed to cope with heavy coal and freight trains to and from the steelworks. These trains were usually worked by train crews from Croes Newydd shed using GWR 2800 Class locomotives based there; given the steep climb from Wrexham to Brymbo, which reached gradients of 1 in 36, a bank engine (such as a GWR 57xx or 56xx Class locomotive) was often used. The more lightly built section beyond Brymbo West to Minera was worked by smaller locomotives, such as the 5700 Class, with engine 9610 being used almost exclusively on this line. In later years BR class 9F and ex-LMS 8F locomotives were also used on steelworks traffic. Steam locomotives continued in use on the line until relatively late under British Railways, with BR Class 24 and 25 diesel's being introduced to Croes Newydd shed from 1967-8.

One unusual aspect of workings on the line was that gravity shunting was permitted at Brymbo on shorter trains even as late as the 1970s. The gradients here could be problematic: there was an incident in the 1970s in which a train ran out of control on the former Vron Branch, and broke through level crossing gates in Brymbo. By the early 1970s, the section of line from Brymbo West to Minera saw only two trains a week, and it was closed in 1972, shortly before Minera Limeworks was itself closed. The last part of the system, the 3-mile line from Brymbo West to Wrexham, remained open for freight trains to and from the steelworks, and as late as the mid-1970s there were 7 return workings a day. This section of line was taken out of use on 1 October 1982, due to increasing amounts of steelworks traffic being sent by road. The steelworks itself closed in 1990-91, along with a final section of the Vron Branch that had remained in use as part of the works' internal railway system. After a period of abandonment, the track was lifted in the late 1980s. Many of the line's bridges and other structures, including the platforms of the former Brymbo station, were not demolished until the 1990s.

A number of structures remain, including a large stone viaduct near Ffrith on the former Joint Railway from Brymbo to Coed Talon. The Moss Valley spur between Wrexham Maelor Hospital and the site of Moss and Pentre Station has now been re-surfaced as a cycle route. Croesnewydd West Signal Box was a post-war G.W Type 14 Box with asbestos roof and 37 lever frame, which controlled the west end of the yard of the same name, to the west of Wrexham. The box was closed at the same time as the line to Brymbo on 4th May 1983. to those who are familiar with Wrexham Maelor Hospital, the photographer is standing behind the bridge which carries Croes Newydd road and the car park for the Hospital.