Scott FW
IMG_5264
After doing things other than G scale trains for some months a little bit of large scale progress has been made on 2 projects.
1: Got 2 layers of thin plywood glued to plastic underroof, which was make od slpiced together original HLW Mack cab roofs, for the welded-body boxcab. Vents and pantograph are merely set in place, will be secured after final roof layer is added.
2: more shaping on the fireman guy's hat. Had intended to build up crown shape with epoxy putty for something new and different but decided that with my health being a bit messy the old familiar tried and true method of Bondo over styrene bits would be used instead.
IMG_5264
After doing things other than G scale trains for some months a little bit of large scale progress has been made on 2 projects.
1: Got 2 layers of thin plywood glued to plastic underroof, which was make od slpiced together original HLW Mack cab roofs, for the welded-body boxcab. Vents and pantograph are merely set in place, will be secured after final roof layer is added.
2: more shaping on the fireman guy's hat. Had intended to build up crown shape with epoxy putty for something new and different but decided that with my health being a bit messy the old familiar tried and true method of Bondo over styrene bits would be used instead.