Back to photostream

New Sewer Pipe

They replaced a few feet of the old concrete sewer pipe with new plastic pipe, and added a clean-out access (once they back-fill and re-build the blacktop, they will replace the plastic clean-out top with a metal one that's designed to be driven on).

4,008 views
0 faves
1 comment
Uploaded on January 14, 2009
Taken on January 14, 2009