Newton Abbot project w/e 21.10.2011
Excavations have had to be made on the ground floor to provide a strong, solid surface for building temporary bracing to the upper floors. Here you can see large steel supports that have been inserted at ground floor level.
366
views
0
faves
0
comments
Uploaded on October 28, 2011
Taken on October 21, 2011
Newton Abbot project w/e 21.10.2011
Excavations have had to be made on the ground floor to provide a strong, solid surface for building temporary bracing to the upper floors. Here you can see large steel supports that have been inserted at ground floor level.