Newton Abbot: week ending 13.5.11
A hole was dug in the library floor to test the make-up of the ground below. This will ensure that when some of the internal walls are taken down, support can be built in the right places to keep the structure strong.
240
views
0
faves
0
comments
Uploaded on May 23, 2011
Taken on May 13, 2011
Newton Abbot: week ending 13.5.11
A hole was dug in the library floor to test the make-up of the ground below. This will ensure that when some of the internal walls are taken down, support can be built in the right places to keep the structure strong.
240
views
0
faves
0
comments
Uploaded on May 23, 2011
Taken on May 13, 2011