Newton Abbot 2nd floor: stairwell
Pre-construction Phase: top floor. The stairwell at the top of the west staircase. All of the furniture had to be removed and was donated to local charities. The carpet has been removed to test the condition of the floor.
The wall with the windows in will be removed as part of the refurbishment so that the historic staircase and stained glass window are visible.
123
views
0
faves
0
comments
Uploaded on May 6, 2011
Taken on May 6, 2011
Newton Abbot 2nd floor: stairwell
Pre-construction Phase: top floor. The stairwell at the top of the west staircase. All of the furniture had to be removed and was donated to local charities. The carpet has been removed to test the condition of the floor.
The wall with the windows in will be removed as part of the refurbishment so that the historic staircase and stained glass window are visible.
123
views
0
faves
0
comments
Uploaded on May 6, 2011
Taken on May 6, 2011