Newton Abbot 2nd floor: fireplace
Pre-construction Phase: top floor. During this phase, an original fireplace was discovered hidden behind some old shelving. This feature will be enhanced during the refurbishment - and won't be hidden again!
95
views
0
faves
0
comments
Uploaded on May 6, 2011
Taken on May 6, 2011
Newton Abbot 2nd floor: fireplace
Pre-construction Phase: top floor. During this phase, an original fireplace was discovered hidden behind some old shelving. This feature will be enhanced during the refurbishment - and won't be hidden again!
95
views
0
faves
0
comments
Uploaded on May 6, 2011
Taken on May 6, 2011