Trailing Suction Hopper Dredger "LANGE WAPPER " Neue Seebäderbrücke Cuxhaven
Type: Hopper Suction Dredger Trailing
Flag: Belgium
Port of registry: Antwerp
Owner: Dredging International NV, Zwijndrecht, Belgium
Year built: 1998
Launched: 1999
Built by: Merwede Shipyard / IHC Holland
Length: 129.80m
Beam: 26.82m
Draft: 9.45m (Dredging Mark)
Deadweight 'all told' at 8.30 m draft 15.800 tons
Deadweight 'all told' at 9.45 m draft 19.400 tons
Loading capacity: 20.333 tons
Hopper capacity: 13,700 m3
Dredging depth: 50.00 m Max.
Suction pipe diameter: 1.200mm
Power:
Two propulsion diesel engines, each 5.520 kW
2 AC main generators, each 3.500 kVA
1 AC auxiliary diesel generator 1.562 kVA
1 AC diesel Gen. Set, emerg. / Serv harbor. 812kVA
3-phase AC electric motors, jet pump drive, each 450kW
2 AC bow thruster motors, each 525kW
Total installed power: 13.100 kW
Download speed: 14.20 knots
Crew: 32 persons
Call Sign: ORMP
MMSI: 205309000
IMO: 9174139
Trailing Suction Hopper Dredger "LANGE WAPPER " Neue Seebäderbrücke Cuxhaven
Type: Hopper Suction Dredger Trailing
Flag: Belgium
Port of registry: Antwerp
Owner: Dredging International NV, Zwijndrecht, Belgium
Year built: 1998
Launched: 1999
Built by: Merwede Shipyard / IHC Holland
Length: 129.80m
Beam: 26.82m
Draft: 9.45m (Dredging Mark)
Deadweight 'all told' at 8.30 m draft 15.800 tons
Deadweight 'all told' at 9.45 m draft 19.400 tons
Loading capacity: 20.333 tons
Hopper capacity: 13,700 m3
Dredging depth: 50.00 m Max.
Suction pipe diameter: 1.200mm
Power:
Two propulsion diesel engines, each 5.520 kW
2 AC main generators, each 3.500 kVA
1 AC auxiliary diesel generator 1.562 kVA
1 AC diesel Gen. Set, emerg. / Serv harbor. 812kVA
3-phase AC electric motors, jet pump drive, each 450kW
2 AC bow thruster motors, each 525kW
Total installed power: 13.100 kW
Download speed: 14.20 knots
Crew: 32 persons
Call Sign: ORMP
MMSI: 205309000
IMO: 9174139