Back to photostream

Hite Crossing Bridge

The informal upstream limit of Lake Powell and the lower end of Cataract Canyon of the Colorado River. Dedicated in 1966 at a cost of $3million ($19 million in 2021) the bridge is the only crossing of the river between Glen Canyon Bridge (185 miles downstream) and Moab (110 miles upstream).

1,112 views
59 faves
5 comments
Uploaded on August 28, 2023
Taken on March 4, 2021