Concrete Driveway-High Point

We applied for and obtained the PERMIT as required. We handled all inspections. We compacted all soil. We poured the 4000 PSI concrete 4 inches in depth on the Owner's side and 6 inches in depth within the county right of way. All joints were cut accordingly. The concrete was hand troweled with a double broom finish.