Having completed the MGR loop, 60059 prepares to depart. The power station stopped generating on Wednesday March 23rd. In the background can be seen the coal handling plant. The large structure between the pylons was the barge tippler when coal came by barge from Kellingley pit. The blue structures are the tube conveyors that handled limestone and gypsum as part of the FGD process.
Taken with permission of SSE.
60059 - The Generating Finale
Having completed the MGR loop, 60059 prepares to depart. The power station stopped generating on Wednesday March 23rd. In the background can be seen the coal handling plant. The large structure between the pylons was the barge tippler when coal came by barge from Kellingley pit. The blue structures are the tube conveyors that handled limestone and gypsum as part of the FGD process.