Bay Bridge East span 2012: cable compression
Right up at the top of the tower the giant rollers needed to compress the loose strands of cable into one strong bundle were just being deployed. The precarious, terrifyingly high walkways are in place so that engineers can inspect the cable and guide the rollers down to the anchored ends of the cable.
9,816
views
2
faves
1
comment
Uploaded on April 30, 2012
Taken on April 18, 2012
Bay Bridge East span 2012: cable compression
Right up at the top of the tower the giant rollers needed to compress the loose strands of cable into one strong bundle were just being deployed. The precarious, terrifyingly high walkways are in place so that engineers can inspect the cable and guide the rollers down to the anchored ends of the cable.
9,816
views
2
faves
1
comment
Uploaded on April 30, 2012
Taken on April 18, 2012