Long Jian Road & Bridge Co., Ltd. — Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge Project — Heihe City, Heilongjiang Province, China
Long Jian Road & Bridge Co., Ltd.
Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge Project
Heihe City, Heilongjiang Province, China
[Image courtesy of Long Jian Road & Bridge Co., Ltd.]
The Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge connects Heihe City, China, to Blagoveshchensk City, Russia. The length of the entire route is 19.9 kilometers, with the cable-stayed bridge portion spanning 1,284 meters in length. Located in the alpine region, the project is subject to extreme temperature variations and strict environmental protection. To meet these challenges and accommodate a short construction schedule, the project team implemented a collaborative BIM approach for delivery of the infrastructure project.
The project team used Bentley’s BIM technology, reality modeling applications, and ProjectWise for collaborative design, modeling, construction management, and information sharing for optimal project coordination through construction. Accurate modeling with ProStructures reduced construction errors and rework, saving five working days and 30 tons of materials. Design and collaboration using OpenRoads and ProjectWise improved modeling efficiency by 35 percent, while ContextCapture helped facilitate asset and security management and optimize earthworks through digital terrain surveys. BentleyLumenRT provided life-like visualizations for improved project performance and communication with the government and public.
Project Playbook: AECOsim Building Designer, ContextCapture, Descartes, LumenRT, MicroStation, Navigator, OpenBridge Modeler, OpenRoads, ProjectWise, ProSteel, ProStructures, and RM Bridge
Long Jian Road & Bridge Co., Ltd. — Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge Project — Heihe City, Heilongjiang Province, China
Long Jian Road & Bridge Co., Ltd.
Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge Project
Heihe City, Heilongjiang Province, China
[Image courtesy of Long Jian Road & Bridge Co., Ltd.]
The Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge connects Heihe City, China, to Blagoveshchensk City, Russia. The length of the entire route is 19.9 kilometers, with the cable-stayed bridge portion spanning 1,284 meters in length. Located in the alpine region, the project is subject to extreme temperature variations and strict environmental protection. To meet these challenges and accommodate a short construction schedule, the project team implemented a collaborative BIM approach for delivery of the infrastructure project.
The project team used Bentley’s BIM technology, reality modeling applications, and ProjectWise for collaborative design, modeling, construction management, and information sharing for optimal project coordination through construction. Accurate modeling with ProStructures reduced construction errors and rework, saving five working days and 30 tons of materials. Design and collaboration using OpenRoads and ProjectWise improved modeling efficiency by 35 percent, while ContextCapture helped facilitate asset and security management and optimize earthworks through digital terrain surveys. BentleyLumenRT provided life-like visualizations for improved project performance and communication with the government and public.
Project Playbook: AECOsim Building Designer, ContextCapture, Descartes, LumenRT, MicroStation, Navigator, OpenBridge Modeler, OpenRoads, ProjectWise, ProSteel, ProStructures, and RM Bridge