Back to photostream

3D Standardized Design and Application of Main Power House of Xiaozhuang Mine Coal Preparation Plant

CCTEG Beijing Huayu Engineering Co, Ltd. – (Bin County, Shaanxi, China)

 

Beijing Huayu Engineering adopted 3D collaborative design standardization in its coal mining and preparation industry with the goal of improving the efficiency of newly built engineering projects by more than 50 percent. The initiative began with the CNY 132.4 million Xiaozhuang mine coal preparation plant project. Implementing Bentley products significantly enhanced design quality and work efficiency.

 

The project benefited from Bentley software in several key areas. ProjectWise allowed the team to realize real-time collaborative design. Bentley Navigator provided clash detection and resolution, which helped to prevent 620 collisions. The design platform built upon MicroStation, OpenPlant, AECOsim Building Designer, and other Bentley products, significantly improved efficiency, shortening the plant design time from 45 to 24 days. Meanwhile, design errors decreased by 95 percent, helping to reduce project delivery costs by CNY 1.21 million.

209 views
0 faves
0 comments
Uploaded on September 3, 2015