Back to photostream

PPL 230KV lines

PPL 230 KV lines spliting. The line on the left runs about a 1/2 mile to the T10 switchyard while the line on the right heads toward wilkes-barre. When the Susquehanna Roseland line is built, all these lines will head into the T10 switchyard and the new 500KV line will come down the hill and across to the left into the 500KV switchyard.

1,318 views
6 faves
0 comments
Uploaded on April 19, 2009
Taken on April 19, 2009