Pool Renovations by Pearl Pool Plastering

The prep for new plaster is now complete, this includes:

 

◦Cutting and chipping under tile (if not being replaced)

◦Chipping around all fittings, lights, etc

◦Removing old fittings and preparing for new (if applicable)

 

Bond coat is applied to the pool to ensure the new material has a good surface to bond to. Plaster has a very smooth surface which doesn’t give the new plaster much to grab on to. The application of an epoxy based bond coat leaves a good rough texture that allows the new plaster to grab onto and form a solid bond preventing future delamination.

 

342 views
0 faves
0 comments
Uploaded on November 12, 2014