Back to photostream

a14_v_bw_o_n (108-KSC-70P-384)

“The command-service module (CSM) for the Apollo 14 lunar mission is undergoing final checks in the Manned Spacecraft Operations Building (MSOB) here prior to mating with the spacecraft-lunar module adapter (SLA). The command, service and lunar modules will be trucked to the Vehicle Assembly Building (VAB) November 4 and mated with the Saturn V. After further checks and installation of the launch escape system (LES), the entire space vehicle will be rolled out to Pad A on November 9. Launch will come at 3:23 p.m, January 31.”

2,002 views
2 faves
1 comment
Uploaded on June 12, 2018