Back to photostream

a_v_bw_o_n (S-66-30349)

The Facility Compatibility Article (FCA) being worked on by possible Brown & Root/Northrop (BRN) technicians during compatibility checkout in Chamber A of the Space Environment Simulation Laboratory (SESL)/Bldg 32, Manned Spacecraft Center (MSC), ca. April 1966.

 

Prior to manned thermal vacuum tests within the chamber, the CSM boilerplate was used for insertion procedure familiarization, as the entire CSM could not be inserted into the chamber in one piece. Each module had to be transferred individually and then stacked on the test stand/platform inside it.

 

I believe this photograph to be of the same CSM boilerplate and taken during the same time period:

 

archive.org/details/S66-30818

 

Additional info at:

 

ston.jsc.nasa.gov/collections/TRS/_techrep/CR-2003-208933...

Credit: Johnson Space Center

 

www.drewexmachina.com/2016/10/26/the-apollo-flights-to-no...

Credit: DrewExMachina website/Andrew LePage

 

Last, but not least:

 

www.nps.gov/articles/space-environmental-simulation-labor...

2,188 views
4 faves
1 comment
Uploaded on March 26, 2018