345022 @ Ealing Broadway
9U93 Heathrow Airport Terminal 4 to Abbey Wood. Class 345 Aventra is a fleet of EMU (electric multiple unit) passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units – each able to carry 1,500 passengers – were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.
345022 @ Ealing Broadway
9U93 Heathrow Airport Terminal 4 to Abbey Wood. Class 345 Aventra is a fleet of EMU (electric multiple unit) passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units – each able to carry 1,500 passengers – were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.