Back to photostream

Topside load-out, Koje, Korea

ALE supplied and operated an external ballasting system for the load-out of the 21,800te LUN-A topside, as well as performing the load-out engineering and barge management.

www.ale-heavylift.com

1,049 views
0 faves
0 comments
Uploaded on March 21, 2013
Taken on December 22, 2009