ALE
ALE - Heavylift
Topside load-out, Koje, Korea
ALE supplied and operated an external ballasting system for the load-out of the 21,800te LUN-A topside, as well as performing the load-out engineering and barge management.
1,049
views
0
faves
0
comments
Uploaded on March 21, 2013
Taken on December 22, 2009
Topside load-out, Koje, Korea
ALE supplied and operated an external ballasting system for the load-out of the 21,800te LUN-A topside, as well as performing the load-out engineering and barge management.
1,049
views
0
faves
0
comments
Uploaded on March 21, 2013
Taken on December 22, 2009