Back to photostream

Bunga Ryer topside load-out, Malaysia

ALE was engaged to engineer, design and perform skidding for the load-out of the 9,19te BRE topside onto a semi-submersible barge.

www.ale-heavylift.com

1,051 views
0 faves
0 comments
Uploaded on March 20, 2013
Taken on January 24, 2006