ALE
ALE - Heavylift
Bunga Ryer topside load-out, Malaysia
ALE was engaged to engineer, design and perform skidding for the load-out of the 9,19te BRE topside onto a semi-submersible barge.
1,051
views
0
faves
0
comments
Uploaded on March 20, 2013
Taken on January 24, 2006
Bunga Ryer topside load-out, Malaysia
ALE was engaged to engineer, design and perform skidding for the load-out of the 9,19te BRE topside onto a semi-submersible barge.
1,051
views
0
faves
0
comments
Uploaded on March 20, 2013
Taken on January 24, 2006