More then you want to know about the Pipeline
* The Trans Alaska Pipeline System was designed and constructed to move oil from the North Slope of Alaska to the northern most ice-free port in Valdez, Alaska.
* Length: 800 miles.
* Diameter: 48 inches.
* Crosses three mountain ranges and over 800 rivers and streams.
* Cost to build: $8 billion in 1977
* Construction began on March 27, 1975 and completed on May 31, 1977.
* Over 15 billion barrels have moved through the Trans Alaska Pipeline System. tankers through Prince William Sound.
Pipeline View
More then you want to know about the Pipeline
* The Trans Alaska Pipeline System was designed and constructed to move oil from the North Slope of Alaska to the northern most ice-free port in Valdez, Alaska.
* Length: 800 miles.
* Diameter: 48 inches.
* Crosses three mountain ranges and over 800 rivers and streams.
* Cost to build: $8 billion in 1977
* Construction began on March 27, 1975 and completed on May 31, 1977.
* Over 15 billion barrels have moved through the Trans Alaska Pipeline System. tankers through Prince William Sound.