salvaged cabinets
first cabinet is installed.
Top part is a salvage out of a house built around 1920. The bottom part was a office desk made around 1900.
Both of them had to be re-worked to fit the space. Added some new lumber for trim and a salvaged crown molding on top.
The Drawers need re-working too and come later. The whole thing is going to be painted white.
I covered the new wood floor with a protective masonite for the duration of the remodeling.
salvaged cabinets
first cabinet is installed.
Top part is a salvage out of a house built around 1920. The bottom part was a office desk made around 1900.
Both of them had to be re-worked to fit the space. Added some new lumber for trim and a salvaged crown molding on top.
The Drawers need re-working too and come later. The whole thing is going to be painted white.
I covered the new wood floor with a protective masonite for the duration of the remodeling.