Tramway Goats
Tramway Goats
Climbing Points
First test of the new Climbing Points for accessing the trial workshop track. There would be considerable difficulty in placing a conventional turnout into the driveway crossing at this location.
Until I can build said turnout, this will be the solution to the lack of workshop access. These could also be used anywhere else on the line to a temporary track as well.
676
views
0
faves
0
comments
Uploaded on November 25, 2016
Taken on November 25, 2016
Climbing Points
First test of the new Climbing Points for accessing the trial workshop track. There would be considerable difficulty in placing a conventional turnout into the driveway crossing at this location.
Until I can build said turnout, this will be the solution to the lack of workshop access. These could also be used anywhere else on the line to a temporary track as well.
676
views
0
faves
0
comments
Uploaded on November 25, 2016
Taken on November 25, 2016