Pontypridd signal box
Grade II listed signal box (Rhondda Branch Junction signal box) closed in 1998 and now boarded up is a modified version of McKenzie and Holland's type 3 design built between the Taff Vale Railway main line to the right and the Rhondda Branch to the left in 1902 controlling 230 levers.
534
views
0
faves
0
comments
Uploaded on April 13, 2015
Taken on April 7, 2015
Pontypridd signal box
Grade II listed signal box (Rhondda Branch Junction signal box) closed in 1998 and now boarded up is a modified version of McKenzie and Holland's type 3 design built between the Taff Vale Railway main line to the right and the Rhondda Branch to the left in 1902 controlling 230 levers.
534
views
0
faves
0
comments
Uploaded on April 13, 2015
Taken on April 7, 2015