Push-Pull
JS activity at the so-called Station 82, about 1 km east of the loading pads of the active eastern part of the pit at Sandaoling. Sandaoling is a push-pull operation. Empty tipper wagons are pushed backed from the disposal points into the open pit to the loading pad at Xikeng. Loaded trains haul the coal chimney first back to the disposal points.
1,806
views
15
faves
4
comments
Uploaded on June 15, 2020
Taken on February 18, 2017
Push-Pull
JS activity at the so-called Station 82, about 1 km east of the loading pads of the active eastern part of the pit at Sandaoling. Sandaoling is a push-pull operation. Empty tipper wagons are pushed backed from the disposal points into the open pit to the loading pad at Xikeng. Loaded trains haul the coal chimney first back to the disposal points.
1,806
views
15
faves
4
comments
Uploaded on June 15, 2020
Taken on February 18, 2017