Pack 'em in
With the CTC cut in working at Iron Junction, and a lot of North Bound traffic on the Missabe sub, the MRF with 901 in the lead was waiting for lights in, with a Minntac loader with 403 leading a half a mile behind, on the other side of the diamond. They both got rolling as the golden hour was in its prime!
1,160
views
21
faves
1
comment
Uploaded on March 28, 2017
Taken on March 27, 2017
Pack 'em in
With the CTC cut in working at Iron Junction, and a lot of North Bound traffic on the Missabe sub, the MRF with 901 in the lead was waiting for lights in, with a Minntac loader with 403 leading a half a mile behind, on the other side of the diamond. They both got rolling as the golden hour was in its prime!
1,160
views
21
faves
1
comment
Uploaded on March 28, 2017
Taken on March 27, 2017