70809 at Bathampton 8th Aug 15'

Colas 70809 reverses a load of old ballast at Bathampton Junction on 8th August 2015.

 

Work was well underway with much of the up loop and up mainline removed.

 

This strech of the GWML between Bath Spa and Box Tunnel is closed until the end of August 15'.