Arcola
A pair of CN SD70M-2s lead L506, which is now based in New Richmond effective last summer, over the St. Croix River into Minnesota on the 2,682-foot Arcola High Bridge built in 1911. CPKC work windows on the Withrow Sub have made for several midday L506 runs over the trestle in recent weeks, and the L517 call time out of Stevens Point was pushed back which made for some daylight runs east of New Richmond.
Arcola
A pair of CN SD70M-2s lead L506, which is now based in New Richmond effective last summer, over the St. Croix River into Minnesota on the 2,682-foot Arcola High Bridge built in 1911. CPKC work windows on the Withrow Sub have made for several midday L506 runs over the trestle in recent weeks, and the L517 call time out of Stevens Point was pushed back which made for some daylight runs east of New Richmond.