Back to photostream

60063 Callow Hill

Long term work to stabilize the embankment continues at Callow Hill, nr Wootton Bassett as 60063 passes with 6B33 13.00 Theale-Robeston on 31/01/18. All the aggregate has been brought to the site by road in an endless convoy of tipper trucks, one of which can be seen leaving having just tipped. The back roads nearby have taken a pounding with pot holes and subsidence !

1,405 views
11 faves
2 comments
Uploaded on January 31, 2018
Taken on January 31, 2018