GNWR 63 Battin Road
This is what the borg looked like shortly after its first assimilation. G&W C424m's 63 & 62 lead Northbound R&S train RS-2 on the little bridge over Battin Road in Rock Glen, NY on August 9, 1986. Power was initially the pair of C424m's along with leased P&LE SW switchers. Chessie power would also run through from Salamanca. By this time the fleet of GP40's were arriving on the property too.
GNWR 63 Battin Road
This is what the borg looked like shortly after its first assimilation. G&W C424m's 63 & 62 lead Northbound R&S train RS-2 on the little bridge over Battin Road in Rock Glen, NY on August 9, 1986. Power was initially the pair of C424m's along with leased P&LE SW switchers. Chessie power would also run through from Salamanca. By this time the fleet of GP40's were arriving on the property too.