loop detail
Close-up of the crossing loop (passing siding) at Summit Tank. The timber sleepers (ties) have been upgraded with 1 in 4 steel sleepers.
871
views
1
fave
0
comments
Uploaded on September 18, 2011
Taken on May 1, 2011
loop detail
Close-up of the crossing loop (passing siding) at Summit Tank. The timber sleepers (ties) have been upgraded with 1 in 4 steel sleepers.
871
views
1
fave
0
comments
Uploaded on September 18, 2011
Taken on May 1, 2011