Back to photostream

Sequence 1/3

There are no dedicated signal or gates men on the Indara-Dhori ghat line. The assistant driver of the railbus also acts as its guard and the gateman. Here the assistant driver is seen closing a level crossing gate (Sequence 1/3, 2/3) and then calling out to the driver to move with caution (Sequence 3/3).

398 views
3 faves
0 comments
Uploaded on July 16, 2013
Taken on July 5, 2012