MP36er
MP36er
Wide Load
The IHB ran a hyrail truck down Main 1 ahead of the special, tying up the portions of the Harbor that are only two main track. On the plus side, the train moved rather steadily once the BNSF 7908 was added to the rear at Blue Island, stopping only at the I&M Canal Bridge and the BN bridge in Congress Park.
BNSF 7908 ES44DC
IHB BIX 5
821
views
1
fave
0
comments
Uploaded on September 3, 2010
Taken on August 28, 2010
Wide Load
The IHB ran a hyrail truck down Main 1 ahead of the special, tying up the portions of the Harbor that are only two main track. On the plus side, the train moved rather steadily once the BNSF 7908 was added to the rear at Blue Island, stopping only at the I&M Canal Bridge and the BN bridge in Congress Park.
BNSF 7908 ES44DC
IHB BIX 5
821
views
1
fave
0
comments
Uploaded on September 3, 2010
Taken on August 28, 2010