darren_lhm
Shower Module V4
Bathroom Module
Version 4
Week 9 - 10 May, 2012
The major changes to the shower module have been the door frame, and the removal of the overhead storage space in the wall of the module. Both these changes were made to assist the installation of the bathroom before it is brought into the bus:
1. The door frame provides rigidity
2. The reduction of the width to exactly 5 modules allows it to fit through the bus doors
Shower Module V4
Bathroom Module
Version 4
Week 9 - 10 May, 2012
The major changes to the shower module have been the door frame, and the removal of the overhead storage space in the wall of the module. Both these changes were made to assist the installation of the bathroom before it is brought into the bus:
1. The door frame provides rigidity
2. The reduction of the width to exactly 5 modules allows it to fit through the bus doors