redcyakgirl
The Chambers
The Chambers parking lot will be repaved as part of a cost share with the Town. A mini bioretention area with plants will be installed in this location with a curb cut. The water from the parking lot will drain into the planter bed. A raised crosswalk with decorative stamped red asphalt will be installed in this area. Sidewalks will also be widened in this area by 4 feet.
The Chambers
The Chambers parking lot will be repaved as part of a cost share with the Town. A mini bioretention area with plants will be installed in this location with a curb cut. The water from the parking lot will drain into the planter bed. A raised crosswalk with decorative stamped red asphalt will be installed in this area. Sidewalks will also be widened in this area by 4 feet.