Class 115 Marylebone
In the summer of 1993, the Chiltern Line modernisation was nearly complete and most class 115 dmus were withdrawn - these vehicles are seen disused outside Marylebone depot. The tracks in the foreground were newly built through the site of the cab road and ramp.
1,863
views
4
faves
0
comments
Uploaded on July 23, 2012
Taken sometime in 1993
Class 115 Marylebone
In the summer of 1993, the Chiltern Line modernisation was nearly complete and most class 115 dmus were withdrawn - these vehicles are seen disused outside Marylebone depot. The tracks in the foreground were newly built through the site of the cab road and ramp.
1,863
views
4
faves
0
comments
Uploaded on July 23, 2012
Taken sometime in 1993