Criga88
Tobruk progress
This week I started to put the details into the superstructure and fill in the gaps in between, it seems to be a good way to power through the design process. As you can see the stbd side is close to finished however I'm struggling to find good photos of the port side without the LCVP in the way. I've also put the bridge equipment in, it's not perfect but it's acceptable for a minifig ship. As for building it's going to have to wait about 3 months as I have a busy work schedule, on the plus side though, I should be finished designing her by then. Feel free to leave any comments or constructive criticism.
PS - She'll be 30 studs (24cm) wide and about 200 studs (160cm) long.
Tobruk progress
This week I started to put the details into the superstructure and fill in the gaps in between, it seems to be a good way to power through the design process. As you can see the stbd side is close to finished however I'm struggling to find good photos of the port side without the LCVP in the way. I've also put the bridge equipment in, it's not perfect but it's acceptable for a minifig ship. As for building it's going to have to wait about 3 months as I have a busy work schedule, on the plus side though, I should be finished designing her by then. Feel free to leave any comments or constructive criticism.
PS - She'll be 30 studs (24cm) wide and about 200 studs (160cm) long.