McLarenboy
McLarenboy
GBN Services Leyton Ro Ro Drawbar Revamp (Stage 2)
Stage two of the DAF CF ROLL-ON/OFF Wagon and Drag, (EU06 HKK) revamp complete with Sticker's, Wheel Trim's and it's SunVisor now Fitted. The next stage includes a full Valet inside and out and a full mechanical check of the Lorry and Trailer before it's MOT.
1,446
views
6
faves
2
comments
Uploaded on December 1, 2015
Taken on November 21, 2015
GBN Services Leyton Ro Ro Drawbar Revamp (Stage 2)
Stage two of the DAF CF ROLL-ON/OFF Wagon and Drag, (EU06 HKK) revamp complete with Sticker's, Wheel Trim's and it's SunVisor now Fitted. The next stage includes a full Valet inside and out and a full mechanical check of the Lorry and Trailer before it's MOT.
1,446
views
6
faves
2
comments
Uploaded on December 1, 2015
Taken on November 21, 2015