Back to photostream

Sunday 466

Engineering work on the Charing Cross to Hastings route on Sunday 20.9.23 meant trains between London and Tunbridge Wells only.

With many of the lines 375’s marooned at West Marina this meant 3/5 of the trains were formed of Networker sets otherwise dormant at Tonbridge on a Sunday.

This is 466025 before departure leading a 10-car formation on the 12.16 Charing Cross to Tunbridge Wells.

It’s not a good time for Met Cam Networkers with weekly withdrawals of 465/9 and 466 as more 707’s arrive from SWR.

489 views
4 faves
0 comments
Uploaded on September 20, 2023