Back to photostream

Coming Together

The shop vac tubing is assembled (mostly!) and the top dust cabinet is built. I need to cut and trim the doors and get some 2” tubing and it will be ready to finalize.

402 views
3 faves
6 comments
Uploaded on June 14, 2022
Taken on June 12, 2022