Cutting Edge ………..
13.5.2015. The area at the front of Sheffield station was part of a multimillion pound regeneration scheme.
The 90metre long stainless 'Cutting Edge' was designed by Si Applied Ltd and was installed in 2007.
Water cascades over the inner surface of a huge 'bar' of steel, hammered flat as it would have been in many of the steel manufacturing processes.
I've used a bit of 'artistic' licence with the water - upping the saturation whilst making the rest of the image monochrome.
Cutting Edge ………..
13.5.2015. The area at the front of Sheffield station was part of a multimillion pound regeneration scheme.
The 90metre long stainless 'Cutting Edge' was designed by Si Applied Ltd and was installed in 2007.
Water cascades over the inner surface of a huge 'bar' of steel, hammered flat as it would have been in many of the steel manufacturing processes.
I've used a bit of 'artistic' licence with the water - upping the saturation whilst making the rest of the image monochrome.