Back to photostream

The first layer of hemp wall and the hemp floor

The formwork was removed after 24 hrs, revealing the first layer of the hemp wall. The hemp floor is part way done.

483 views
0 faves
0 comments
Uploaded on October 20, 2011
Taken on October 20, 2011