Back to album

UK CHANNEL TUNNEL CONSTRUCTION LOCOMOTIVE

THIS 27 TONNE ELECTRIC LOCOMOTIVE IS DESIGNED TO WORK BACK-TO-BACK WITH A SIMILAR UNIT. A FLEET OF 2O PAIRS OF THESE LOCOMOTIVES PROVIDED THE MAIN HAULAGE FOR CONSTRUCTION MATERIALS IN THE TWO RUNNING TUNNELS UNDER THE CHANNEL BETWEEN MAY 1989 & JUNE 1991. RA 36 IS DISPLAYED IN THE NRM YORK IN THE CONDITION IN WHICH IT LAST WORKED.

467 views
3 faves
0 comments
Uploaded on November 29, 2015
Taken on August 22, 2015