Back to photostream

Reverse Move

The scrap job back down the drill track at Red Rock towards the switch leading onto the island along Red Rock Road for more routine switching. 4402 has held down this job for over two weeks at this point.

1,078 views
22 faves
0 comments
Uploaded on April 17, 2020
Taken on March 15, 2020