Back to photostream

Sentinel bulker

The retaining iron work is slowly taking shape now.

The head board and associated ironwork is all done along with the centre posts.

The box section tie bar at the top is one of three and have been curved using a power ring rolling machine. This is a small rise of approx. 4" to allow rain to run off the sheet.

All the iron work will be completed before the drop sides and tailboard are started on.

546 views
1 fave
0 comments
Uploaded on February 27, 2016
Taken on February 27, 2016