Lady Row (WiP 3)
The gateway of Holy Trinity church and the pantile roof are done, so is the upper floor window, just the main shop window and doorway and pavement to go. Drawn with a Staedtler 0.3mm pencil and a blending stump on A4 cartridge paper sketchpad.
1,937
views
23
faves
2
comments
Uploaded on June 22, 2021
Taken on June 21, 2021
Lady Row (WiP 3)
The gateway of Holy Trinity church and the pantile roof are done, so is the upper floor window, just the main shop window and doorway and pavement to go. Drawn with a Staedtler 0.3mm pencil and a blending stump on A4 cartridge paper sketchpad.
1,937
views
23
faves
2
comments
Uploaded on June 22, 2021
Taken on June 21, 2021