Stage 1
Folding back the top seam and applying the primer to the roof membrane. The shiny top fold shows the protective cellophane layer covering the Factory Applied Tape (FAT). Roofers can use any thing at their disposal to hold the overlap back in place (white can in this case) as this lap needs to be kept away from the primer till it is dry.
292
views
0
faves
0
comments
Uploaded on November 3, 2010
Taken on July 9, 2010
Stage 1
Folding back the top seam and applying the primer to the roof membrane. The shiny top fold shows the protective cellophane layer covering the Factory Applied Tape (FAT). Roofers can use any thing at their disposal to hold the overlap back in place (white can in this case) as this lap needs to be kept away from the primer till it is dry.