cage
two dockers are being loaded in a cage to the top of a 350ton unit that is being discharged from the heavy lift vessel Anne-Sofie. The cargo was loaded in Taragonna and is destined for the Total refinery. It is part of a 1 billion investment by Total in the Antwerp refinery which is the second largest refinery in Europe. The total project will involve 5 ship loads that will be brought in over the ABES Terminal of which this is the first.
Vessel details Anne-Sofie :
Part oType 176 Heavy lift vessel
Length over all : 159,80m
Beam : 24.34m
Maximum draught : 9,00m
Gross registered tonnage : 12950
Nett tonnage : 4647
Built : 2008 (april)
Yard : JJ Sietas KG
Gear : 2 cranes eacht 700 tons SWL, 1 crane 350 tons SWL
Hold (LWH) : 107,10m x 17,00m x 13,29m
Engine : MAN B&W 9L58/64
Power output : 12600 kW
cage
two dockers are being loaded in a cage to the top of a 350ton unit that is being discharged from the heavy lift vessel Anne-Sofie. The cargo was loaded in Taragonna and is destined for the Total refinery. It is part of a 1 billion investment by Total in the Antwerp refinery which is the second largest refinery in Europe. The total project will involve 5 ship loads that will be brought in over the ABES Terminal of which this is the first.
Vessel details Anne-Sofie :
Part oType 176 Heavy lift vessel
Length over all : 159,80m
Beam : 24.34m
Maximum draught : 9,00m
Gross registered tonnage : 12950
Nett tonnage : 4647
Built : 2008 (april)
Yard : JJ Sietas KG
Gear : 2 cranes eacht 700 tons SWL, 1 crane 350 tons SWL
Hold (LWH) : 107,10m x 17,00m x 13,29m
Engine : MAN B&W 9L58/64
Power output : 12600 kW